Product Details
Place of Origin: Shandong, China
Brand Name: Shandong Shiqi Machinery
Certification: CE
Model Number: DDG4-3.0G
Payment & Shipping Terms
Minimum Order Quantity: 1 Set
Price: USD 6,800 - 7,700 / Set
Packaging Details: Plywood case and steel frame, seaworthy export packing
Delivery Time: 25-40 days after deposit
Payment Terms: T/T, L/C at sight
Supply Ability: 50 Sets per Month
Total Load: |
4,000 Kg |
Load Per Deck: |
2,000 Kg |
Upper Lift Height: |
3,000 Mm |
Platform Size: |
5,500 X 2,600 Mm |
Pit Depth: |
800 Mm |
Galvanizing: |
Hot Dip 85 Micron |
Salt Spray: |
480 Hours |
Power Supply: |
380V / 60Hz / 3 Phase |
Net Weight: |
3,100 Kg |
Warranty: |
24 Months |
Total Load: |
4,000 Kg |
Load Per Deck: |
2,000 Kg |
Upper Lift Height: |
3,000 Mm |
Platform Size: |
5,500 X 2,600 Mm |
Pit Depth: |
800 Mm |
Galvanizing: |
Hot Dip 85 Micron |
Salt Spray: |
480 Hours |
Power Supply: |
380V / 60Hz / 3 Phase |
Net Weight: |
3,100 Kg |
Warranty: |
24 Months |
On the coast at Veracruz, Santos or Guayaquil, a painted double deck lift starts showing rust bleed at the weld seams within eighteen months, and once corrosion reaches the column guides the platform stops running true. This 4 ton model is hot dip galvanized after fabrication, giving an 85 micron zinc layer on every surface including the inside of the box sections and the weld toes.
The upper platform lifts to 3,000 mm on a 5,500 x 2,600 mm deck, and the unit runs on 380V 60Hz three phase with a 5.5 kW power pack. The control cabinet is IP65 with stainless hinges and a breather vent, because on a tropical coast it is condensation rather than direct rain that destroys contactors.
Key Features| Parameter | Specification |
|---|---|
| Total Rated Load | 4,000 kg / 8,800 lb |
| Rated Load Per Deck | 2,000 kg / 4,400 lb |
| Upper Deck Lift Height | 3,000 mm |
| Platform Size | 5,500 x 2,600 mm |
| Pit Depth Required | 800 mm |
| Galvanizing | Hot dip, 85 micron average |
| Salt Spray Resistance | 480 hours, no red rust |
| Control Cabinet | IP65 stainless with breather |
| Power Supply | 380V / 60Hz / 3 Phase, 5.5 kW |
| Lifting Speed | 3 m/min |
| Net Weight | 3,100 kg |
| Surface | Galvanized checkered plate |
Coastal parking operators, hotel and condo garages, port authority depots and marina service yards use this specification. It is also the right choice for open sided carports where wind driven spray reaches the structure, because galvanized steel tolerates conditions that would strip a powder coated finish in one hurricane season.
Installation And Site PreparationField touch up is rarely needed with a galvanized frame; if a hole must be drilled on site we supply zinc rich cold galvanizing compound in the accessory box. The 800 mm pit needs a raised sump and, on coastal sites, a 150 mm concrete curb around the pit mouth so wash water and rain run away from the hydraulic compartment instead of into it.
Market Fit And ShippingMexico and Brazil shipments to Manzanillo, Veracruz or Santos take 28 to 34 days, with Spanish and Portuguese manuals supplied on request. Brazilian buyers usually need 380V 60Hz and NBR compliant terminal marking for customs clearance, which we build to as standard for that destination. Galvanizing adds three days to the production schedule.
Build Quality And Quality AssuranceCoating thickness is checked with a gauge at six points on every frame and the readings travel with the documents. Eight years of coastal service reports show the structure is rarely the first failure; the electrics and the piston rod surface are. That is why this model pairs galvanizing with an IP65 cabinet and chrome or stainless rods rather than relying on the coating alone.
Ordering NotesModel reference DDG4-3.0G. Platform sizes, load ratings, drive type and finish can be customised; send your site dimensions, vehicle mix and electrical supply, and we will return a dimensioned proposal with drawings.